By BasisPoint Insight
June 30, 2025 at 9:58 AM IST
NTPC Green Energy Ltd. on Friday said commercial operations will begin Saturday for two commissioned solar units totalling 288.9 megawatt at its Khavda site in Bhuj, Gujarat.
The first is a 142.2 megawatt unit forming part of the 300 megawatt Khavda solar project under the 450 megawatt Hybrid Tranche V, developed by wholly-owned subsidiary NTPC Renewable Energy Ltd., the company said in a stock exchange filing.
Additionally, commercial operations will begin for 146.7 megawatt of the 1.26 gigawatt Khavda-I solar photovoltaic project under the Central Public Sector Undertaking Scheme Phase-II Tranche-III.