By BasisPoint Insight
September 4, 2025 at 6:55 AM IST
Adani Power Ltd. on Tuesday said it has received the coal ministry’s approval to begin operations at its subsidiary’s Dhirauli mine in Madhya Pradesh. The block has a peak capacity of 6.5 mtpa, including 5 mtpa from open cast mining and the balance from underground operations.
This is Adani Power’s first captive coal mine to get operational clearance, with a 30-year lease. The company said the mine will support cost optimisation and enable it to supply power at competitive prices.